Monday, April 21, 2008
Aran is complete
Had a nice weekend with the weather and the rain stopping sooner than expected. Got a good walk in on Sat. Sunday I took the road bike out for 3 hours, the weather was perfect, the views great. It is fun exploring the new roads of Juneau county, the only issue is I may run in to rutted dirt roads, but I think I know where they are. Anyway, I also had time to sew and cut my aran, it was going to be a cardigan, but once I cut the steek for the neck I thought it will work a v-neck as well, so I stopped there. I did have to go back and add to the neck it was too big and I also add 2 short rows to the back for the collar. It was a fun knit, I do like the sheep fold design, you don't need any cabling needles to do it. My gauge is getting better even with this type, but that % of a stitch is very important. I didn't have any hem on and it was a little short so I did add the garter stitch to it, which you can't see in these pictures.
Friday, April 18, 2008
Monday, April 14, 2008
Back from Santa Fe
It was a nice week. I would have pictures now, but I guess I am not smart enough to take pictures from AOL and put them in a blog. Anyway, the weather wasn't the best. Only one day over 60 degrees. We actually awoke two days with snow on the ground. It is what I expected, lots of art and museums. The history is great, thanks to Marilyn and her knowledge. The area is easy to get around. We stayed one block from the plaza which made getting around very easy. My wish to bike in the mountains didn't happen, to cold and windy. I did get two long walks in, the fun part is the unknown of walking in new towns. I just followed one street to the end and knowing my directions I was able to make a circle around most of Santa Fe in 2 1/2 hours. It has a very religous feeling for me with the missions and churches everywhere. Honestly a couple are each a block apart. Pictures to follow.
Tuesday, April 1, 2008
My Dream House
My dreams of home ownership are coming true. It has been a long process, design, lot selection etc. It will still be 6 months before move in day. I hope all of this rain doesn't flood the pond in front of the house and slow things down. I guess it is good to know if there will be flooding issues in the Spring. I will keep you all updated on progress and have you guys give input on color choices. AF Romie.
Subscribe to:
Posts (Atom)